|
This
sheet and copies of the manufacture’s joint sealing installation
instructions are included with all Metposite.tm
panel deliveries. |
|
Please
Click Here for Printable and Downloadable Versions of this File |
|
Receiving a
shipment of Metposite.tm
panels |
|
1. Take utmost care in reviewing packaging and shipment for damage in
shipment.
Please Read: Claims for
freight shortages: All claims for shortages must be noted on the
freight bill of lading at the time of delivery. Any claims for
shortages not noted on the bill of lading will be denied. Contact
Metposite within 24 hours of receiving goods for any freight claims or
shortages. No claims for shortage or damage will be accepted beyond 24
hours.
2. Open shipment and verify proper color of panels.
3. Measure panels for proper size.
If you have
requested a map with your panels, verify panel sizes and compare to
map. (Enclosed in this packet) Map: size and location codes are
located on back of panels.
4. Once
you have verified your shipment meets your requirements and is free of
factory defect, shipment damage and is of proper size, you can now
move to the installation.
|
|
Storage of
Metposite.tm
panels prior to installations |
|
5. Important
- Please Read:
Panels must be kept dry and out of direct sunlight until ready to
install. Prolonged
exposure to the elements can cause damage to the panel’s stiffener
material and/or the vinyl protective covering.
We recommend keeping the panels covered with an opaque
heavy-duty waterproof tarp. |
|
Perpetration
to install Metposite.tm
panels |
 |
|
6. Metposite
is shipped with a vinyl
protective covering; do not remove covering until product has
been installed on building. The only required removal
of
vinyl is to expose attachment leg of panel system prior to screw
installation.
|
|
7. Verify
substrate conditions, it is important you install Metposite on a
true flat surface, verify substrate meets allowed tolerance
for true surface application. In an application with the panels
mounted directly over solid substrate, make sure there are no bumps or
waves to wall condition. In an application with the panels mounted on
zee, cee or hat channels, make sure the zee, cee or hat channels are
correctly aligned for proper panel compression, screw attachment and
joint sealing conditions.
|
|
Installing
Metposite.tm
panels |
|
Important:
All
installers must be pre-approved by Metposite before installing this
product.
If you are not an approved Metposite installer, please contact
us for information on getting approved. (Contact information located
at bottom of this page)
|
|
8. Place
a panel in its proper location, level the panel and make sure it has
proper reveal on each side.
9.
Install screws into wall or standoffs. (Size and type of screw will
vary depending on your project condition requirements.
Please refer to blueprint or specification to verify correct
fasteners)
10.After securing the panel, stand back from surface, verify panel is
plumb, level, and that edge reveal is correct.
11. Once above inspections have been made you may remove the vinyl
protective covering. |
|
Sealing
joints |
|
12. Metposite.tm
recommends you have a professional do your panel sealing for you, this
is a critical aspect of the complete Metposite.tm
system.
A. There
are many factors that need considering for this portion of the
installation; weather conditions, material type and wall types
(example: cmu, brick, wood etc).
B. If
you are going to install your joint sealing yourself, refer to the
manufacture’s joint sealing installation instructions (Enclosed in
this packet).
C. Note!
Metposite does not warrant joint sealing of your project.
This is why we recommend a professional do your joint sealing so
that contractor can carry the warranty for you.
|
|
13. For flashing requirements of your project, please refer to the
standard details (available online at www.metposite.com or by
request at 503.538.4402)
Flashing
details are only guidelines; your project conditions may require a
professional for detail conditions. We recommend you consult a
professional sheet metal contractor, architect or engineer before
designing flashing to complement your quality Metposite system.
|
|
Thank you for choosing Metposite.tm
as your quality alternative flat wall panel system. |
|
If you have questions or need future assistance,
please contacted us at:
503.981.5900
fax 503.981.5901
e-mail info@metposite.com
|